Maintenance Logbook 2 High risk area(s) 3 Medium risk area(s)
| Segment info | |
|---|---|
| Line ID | 103 |
| Pylons interval | 1 - 7 |
| Area info | |
| Powerline length | 1100 m |
| Area extension | 90000 m2 |
| Area altitude AVG | 80 m a.s.l. |
| Powerline info | |
| Pylon span length | 80 m |
| Pylon height | 20 m |
| Voltage level | 6 kw |
| 01/03/2019 | Cutting end |
| 27/02/2019 | Cutting start |
| 10/11/2019 | RPAS inspection done |
| 20/01/2019 | RPAS inspection scheduled |
| 04/06/2018 | In the field visual inspection |
| 01/06/2018 | Conductor breakage due to a fallen tree |
| 04/03/2018 | Cutting end |
| 02/02/2018 | Cutting start |
High clearance risk
Maintenance rescheduling needed
Maintenance scheduled for 12/03/2020
| Weather-based fall | ||
| Growth over estimation | ||
| Dying for stress |
| Next inspection scheduled | - |
| Last mission performed |
-
|
| Last data processing |
4 warnings