Maintenance Logbook 2 High risk area(s) 3 Medium risk area(s)
Segment info | |
---|---|
Line ID | 103 |
Pylons interval | 1 - 7 |
Area info | |
Powerline length | 1100 m |
Area extension | 90000 m2 |
Area altitude AVG | 80 m a.s.l. |
Powerline info | |
Pylon span length | 80 m |
Pylon height | 20 m |
Voltage level | 6 kw |
01/03/2019 | Cutting end |
27/02/2019 | Cutting start |
10/11/2019 | RPAS inspection done |
20/01/2019 | RPAS inspection scheduled |
04/06/2018 | In the field visual inspection |
01/06/2018 | Conductor breakage due to a fallen tree |
04/03/2018 | Cutting end |
02/02/2018 | Cutting start |
High clearance risk
Maintenance rescheduling needed
Maintenance scheduled for 12/03/2020
Weather-based fall | ||
Growth over estimation | ||
Dying for stress |
Next inspection scheduled | - |
Last mission performed |
-
|
Last data processing |
4 warnings
View
|